KONZERNSEITENKonzernportalChilechuan EnergieQingcheng KI-RechenzentrumChilechuan MilchChilechuan TourismusLieferketten-NetzwerkChilechuan Power GroupForschungsinstitut für ElektroausrüstungChilechuan HandelsgruppeChilechuan BergbaugruppeChilechuan ChemiegruppeKonzernportalwww.clc-group.cnChilechuan Energieenergy.clc-group.cnQingcheng KI-Rechenzentrumaicloud.clc-group.cnChilechuan Milchdairy.clc-group.cnChilechuan Tourismustravel.clc-group.cnLieferketten-Netzwerkscm.clc-group.cnChilechuan Power Grouppower.clc-group.cnForschungsinstitut für Elektroausrüstungrnd.clc-group.cnChilechuan Handelsgruppetrade.clc-group.cnChilechuan BergbaugruppeAktuellmining.clc-group.cnChilechuan Chemiegruppechem.clc-group.cnmining.qyjt-demo.reiy.cn · 11 SeitenAdmin-Anmeldung
Underground / pit-face working areas 38 Stripping today 462,000 t Feed grade 62.4% ● 1,286 days without incident Hohhot, Inner Mongolia 40.8414°N / 111.7519°E
Chilechuan MiningCHILECHUAN MINING
Sprache · 4 Sprachversionen
简体中文ZHEnglishENМонголMNРусскийRU
Manuell übersetzt · keine Echtzeit-Übersetzung
Geschäftsanfrage
ZK-118ZK-204 ZK-311ZK-407
◆ Chilechuan Bergbaugruppe · group site node

Was 200 Millionen Jahre begraben lag,
wird gefördert und klar genutzt

Chilechuan Mining betreibt fünf Hauptbergwerke in der Inneren Mongolei: Seltene Erden, Koks- und Kraftwerkskohle sowie Eisenkonzentrat. Von der 3D-Geomodellierung bis zum autonomen Abbau trägt jede Tonne Gehalt und Zielort.

638 100 M tProven resources
5main mines
1,286 dayssafety without incident
Live mining status · open pit, Zone A● 38/38 on-board terminals online
1,180m1,240m1,300m
46.210k tTotal stripping today
62.4%Current feed grade
78.6%Rare earth recovery rate
0.42m³ per 10k tEnergy use per tonne of ore
4.26GWRenewable capacity+12.4% YoY
18,600racksCompute racks in service+8.1% YoY
1.12Data centre PUE-0.03 YoY
620,000tDairy annual capacity+5.6% YoY
01

Mine locations

Five main mines in Inner Mongolia · resources and grades reviewed annually

Rare earths / iron Bayan Obo mining area
43.5 M t of rare earth oxides
REO grade 6.2%

Main mining area of Baotou Steel and the largest rare-earth associated deposit in the world

Thermal coal Jungar coalfield
Proven reserves 26.8 bn t
Calorific value 5,480 kcal/kg

Premium thermal coal, ultra-low sulphur and phosphorus

Non-caking coal / long-flame coal Dongsheng coalfield
Proven reserves 19.6 bn t
Ash 8.4%

State-planned large coal base

Coking coal / coke Wuhai coal and coke district
Proven reserves 4.2 bn t
Coke CSR 68%

Northwest coking coal distribution hub

Lignite Huolinhe coalfield
Proven reserves 13.1 bn t
Calorific value 3,200 kcal/kg

2,400 MW of co-located mine-mouth power

02

Full mining, processing and smelting chain

From exploration to metal recovery — a four-stage closed loop

01

Geological exploration

3D seismic plus drilling verification, with resources reviewed to JORC standards

Resource reliability 92%
02

Open-pit mining

Five open-pit mines with 38 × 220 t electric-drive haul trucks in autonomous platoons

462,000 t stripping a day
03

Ore processing and purification

Three lines — dense medium, flotation and magnetic separation — with a 78.6% rare earth recovery rate

Concentrate grade 62.4%
04

Smelting and processing

Combined pyrometallurgical and hydrometallurgical process, with waste-heat power generation and tailings utilisation

Metal recovery 94.1%
03

Products and grades

Long-term customers first · spot listings sync to the group OA procurement platform

ProductsQuality parametersAnnual capacityMain producing areasStandards / certification
Rare earth oxides REO 99.9% 48,000 t/yr Bayan Obo ISO 9001 / REACH
Coking coal Ash ≤ 9.5% 18.6 M t/yr Wuhai · Ganqimaodu GB/T 5751
Thermal coal Calorific value ≥ 5,400 kcal/kg 32.4 M t/yr Jungar · Dongsheng Long-term contracts + spot
Iron concentrate TFe ≥ 65% 7.8 M t/yr Bayan Obo ISO 9001
Coke CSR ≥ 66% 4.2 M t/yr Wuhai Exported to Japan, Korea and Southeast Asia

Green mining and safety HSE / GREEN MINE

All five mines are on the national green mine list. Pits are water-sprayed for dust suppression, haul roads are paved and the processing plant discharges no wastewater; tailings are re-processed for backfill and building materials, giving an 86.4% utilisation rate. On safety we run the two-permit three-system regime plus a dual checklist for hazard inspection, risk work permits share the same source as group OA approvals, and pre-shift meeting records are archived automatically.

Tailings utilisation rate86.4%
Mine greening coverage72.0%
Closed-loop hazard rectification rate100%
Recordable incidents1,286 days without a lost-time injury0

Smart mine development SMART MINE

Autonomous mine trucks38 units in platoonsEfficiency +18%
Remote-controlled excavators8 × 5G remote-controlled unitsManpower -42%
3D geological modellingDynamic resource reviewAccuracy ±3.2%
Blend optimisation algorithmStable feed gradeVariation -36%
Equipment health predictionPHM for key unitsUnplanned downtime -27%
Mine-side data returns through edge gateways to the group metric platform, sharing one set of master data with OA, procurement and finance.
04

Transport and storage nodes

AMap Open Platform · GCJ-02 · redundant with Baidu Maps

Group HQ · Hohhot40.8414°N / 111.7519°EHQ / control hub
Ulanqab Wind Base40.9946°N / 113.1328°E2.31 GW
Ordos Solar Base39.6084°N / 109.7813°E1.95 GW
Qingcheng AI Computing Centre40.8122°N / 111.6705°E18,600 racks / PUE 1.12
Xilin Gol Grassland Farm43.9333°N / 116.0864°E620,000 t/yr raw milk
Hulunbuir Tourism Camp49.2120°N / 119.7400°E8 routes
05

Group news

Sprachversionen 4

Long-term, spot and tender
All through this one entry point

Once you submit your requirement the system creates a lead and pushes it to the group OA; the sales centre and materials procurement department respond within 2 hours with a grade report, haul distance and price range.