Chilechuan Mining betreibt fünf Hauptbergwerke in der Inneren Mongolei: Seltene Erden, Koks- und Kraftwerkskohle sowie Eisenkonzentrat. Von der 3D-Geomodellierung bis zum autonomen Abbau trägt jede Tonne Gehalt und Zielort.
Five main mines in Inner Mongolia · resources and grades reviewed annually
Main mining area of Baotou Steel and the largest rare-earth associated deposit in the world
Premium thermal coal, ultra-low sulphur and phosphorus
State-planned large coal base
Northwest coking coal distribution hub
2,400 MW of co-located mine-mouth power
From exploration to metal recovery — a four-stage closed loop
3D seismic plus drilling verification, with resources reviewed to JORC standards
Resource reliability 92%Five open-pit mines with 38 × 220 t electric-drive haul trucks in autonomous platoons
462,000 t stripping a dayThree lines — dense medium, flotation and magnetic separation — with a 78.6% rare earth recovery rate
Concentrate grade 62.4%Combined pyrometallurgical and hydrometallurgical process, with waste-heat power generation and tailings utilisation
Metal recovery 94.1%Long-term customers first · spot listings sync to the group OA procurement platform
| Products | Quality parameters | Annual capacity | Main producing areas | Standards / certification |
|---|---|---|---|---|
| Rare earth oxides | REO 99.9% | 48,000 t/yr | Bayan Obo | ISO 9001 / REACH |
| Coking coal | Ash ≤ 9.5% | 18.6 M t/yr | Wuhai · Ganqimaodu | GB/T 5751 |
| Thermal coal | Calorific value ≥ 5,400 kcal/kg | 32.4 M t/yr | Jungar · Dongsheng | Long-term contracts + spot |
| Iron concentrate | TFe ≥ 65% | 7.8 M t/yr | Bayan Obo | ISO 9001 |
| Coke | CSR ≥ 66% | 4.2 M t/yr | Wuhai | Exported to Japan, Korea and Southeast Asia |
All five mines are on the national green mine list. Pits are water-sprayed for dust suppression, haul roads are paved and the processing plant discharges no wastewater; tailings are re-processed for backfill and building materials, giving an 86.4% utilisation rate. On safety we run the two-permit three-system regime plus a dual checklist for hazard inspection, risk work permits share the same source as group OA approvals, and pre-shift meeting records are archived automatically.